Case Studies

 


1-3 Grafton St, Balmain.

The complex at 1-3 Grafton Street, Balmain comprimises 28 residential units contained in 3 attached blocks...                  

 

349 Victoria Pl, Drummonyne.



Concrete spalling repairs, waterproofing to roof and planter boxes. Window and door replacement...

2 Ramsgate Ave, Bondi.

The property is a 3 level, 8 unit complex. It was in its original state with minimal repair undertaken...                              

 


The Macleay Hotel.

Mainland were contracted to replace all existing windows to the Macleay Hotel and Sydney Seviced Apartments...

8 Avona St, Glebe.

The property is a 3 level, 16 unit complex. The property had considerable areas of render delaminating and cracking...  

 

4 Severn St, Maroubra.

The building at 4 Severn Street, Maroubra had a number of problems that Mainland Building Solutions were contracted to fix...


50 Roslyn Gardens, Elizabeth Bay.

Roslyn Gardens was experiencing severe spalled concrete, as well as deteriorating facade coatings...